HOME>>NEWS>>2024 and Earlier

Peiport 550 kV and 40.5 kV / 31,500 A Dry-Type RIP Bushings Supplied to a National Power Demonstration Project

In October 2024, Peiport’s 550 kV dry-type RIP bushings and 40.5 kV / 31,500 A low-voltage high-current dry-type RIP bushings passed all routine tests on the first attempt after assembly at Hitachi Energy’s transformer facility in Chongqing. The products were supplied for the Datang Yuncheng 630 °C ultra-supercritical double-reheat national power demonstration project, the only million-kilowatt-class coal-fired demonstration project approved during China’s 13th Five-Year Plan period.

The Datang Yuncheng project features million-kilowatt-class double-reheat units with operating parameters described as the highest in the world for this class of equipment. The project reports four records among comparable units: highest pressure, highest temperature, highest efficiency and lowest coal consumption. It was included in the National Energy Administration’s fourth list of first-of-a-kind major technical equipment in the energy sector. Successful delivery and testing of the bushings demonstrate Peiport’s manufacturing capabilities in EHV and high-current dry-type bushings and strengthen its position in equipment supply for large generating units.

 

Request Datasheet & Quotation
For datasheets, technical parameters or a quotation, please leave your contact details .
Send Inquiry