Peiport 750 kV RIP Transformer Bushings and 800 kV Dead-Tank Circuit Breaker Bushings Enter Service at China Energy’s Bozhou Power Plant in Xinjiang

The China Energy Bozhou “Two Joint Operations” Integrated Energy Demonstration Project is one of the first batch of demonstration projects approved and filed by the National Development and Reform Commission under the “Two Joint Operations” initiative. It is also China Energy Group’s first integrated energy project in Xinjiang that integrates wind, solar, coal-fired power, heating and energy storage, with a planned capacity of 1,320 MW of coal-fired power and 2,640 MW of new energy.

In November 2025, Shandong Peiport Electric Power supplied 750 kV RIP transformer bushings and 800 kV hollow composite insulators for the project’s 2 × 660 MW coal-fired power units. The 750 kV RIP transformer bushings were assembled by Baoding Tianwei Baobian Electric before deployment. Both product types passed all acceptance checks in August 2026 and were officially energized and put into operation.

The successful delivery and commissioning of these 750 kV and 800 kV products mark a new milestone for Shandong Peiport Electric Power in technical expertise and manufacturing competence for supporting extra-high voltage large-capacity power generation units.

Request Datasheet & Quotation
For datasheets, technical parameters or a quotation, please leave your contact details .
Send Inquiry