The State Grid Tibet High-altitude UHV Test Hall is located at the Yangbajing Base with an altitude of 4,300 meters. It is currently the world’s UHV test hall with the highest elevation, largest clear dimension and strongest comprehensive test capability. It can perform external insulation verification and assessment for UHV equipment of 1000kV AC, ±1100kV DC and below. In December 2023, the self-developed 1500kV/2A SF₆ gas bushings for gas test transformers manufactured by Shandong Peiport Electric Power Science & Technology Co., Ltd. completed on-site installation and commissioning and passed all acceptance tests at one attempt.

