The Three Gorges New Energy Jiangsu Rudong 800MW Offshore Wind Power Project is Asia’s first offshore wind power project adopting VSC-HVDC transmission for power delivery. It achieved full-capacity grid connection in 2021. At that time, it was the world’s offshore wind VSC-HVDC project with the largest capacity and highest voltage level, supported by Asia’s first offshore VSC-HVDC converter station. In 2020, the ±400kV post composite insulators of Shandong Peiport Electric Power Science & Technology Co., Ltd. were applied to the key supporting assemblies of the converter valve towers of this project.