Gongzui Hydropower Station on the Dadu River was fully commissioned in 2009. It is a key project of China Energy Investment Corporation’s cascade development and an important hydropower source for Sichuan Power Grid. In June 2026, the 550kV oil/SF₆ RIP dry-type bushings manufactured by Shandong Peiport Electric Power Science & Technology Co., Ltd.were applied to the Phase II main transformer expansion project of the 500kV booster station at Gongzui Hydropower Station on the Dadu River.
